BLOG| HIGH TECH ROOFING & WATERPROOFING SINGAPORE

Roof leakage repair | Roofing Repair | Waterproofing Specialist

5 Steps before Roof Waterproofing steps to follow ?

Posted on - 19 February 2023 Waterproofing Contractor by HIGH TECH ROOFING COMPANY

There are minimum 5 steps to take before waterproofing

  • clean the substrate;
  • examine the surfaces to be waterproofed;
  • prepare the surfaces;
  • check and renovate the joints and the wells;
  • proceed to the waterproofing of joints and drains.

Is waterproofing permanent? While basic waterproofing membranes should last at least ten years, they can last much longer given the right choice and circumstances. Conversely, poor quality waterproofing will rarely last the distance.

How many methods are of waterproofing? The most common types of waterproofing are cementitious waterproofing, liquid waterproofing membrane, bituminous membrane, bituminous coating, and polyurethane liquid membrane.

CONTACT HIGHT TECH ROOFING COMPANY NOW..!